Skip to content

Judicial Watch • H SAOilProj

H SAOilProj

H SAOilProj

Page 1: H SAOilProj

Category:Obtained Document

Number of Pages:1

Date Created:July 17, 2003

Date Uploaded to the Library:July 30, 2013

Tags:keeping, projects, arabia, selected, Saudi, million, total, Development, project, south, EPA


File Scanned for Malware

Donate now to keep these documents public!

  • demand_answers

See Generated Text   ˅

Autogenerated text from PDF

UNCLASSIFIED 
Saudi Arabia: 
Major Oil and Natural Gas Development Projects 

Project  Completion  Cost  Capacity  Company  
Date million)  
Aramco Crude Oil  

Haradh Gas-Oil Separation Plant No.  March 2003  $320 NIA NIA  300,000 b/d 500,000 bid 300,000 bid  Aramco Aramco Aramco  
Qatif Crude Haradh Gas-Oil Separation Plant No.  2005 NIA 
South Ghawar Area Development (Core Gas Venture #1)  NIA  NIA  NIA  TotalFinaElf,, ExxonMobil, Shell, BP, Chevronffexaco, ENl,  
Red Sea Area Development (Core Gas Venture #2)  NIA  NIA  NIA  TotalFinaElf ExxonMobil Shell, Conoco, Enron/Occidental, Marathon  
Shaybah Area Development (Core Gas Venture #3)  NIA  NIA  NIA  TotalFinaElf,, ExxonMobil, Shell, Conoco, Enron/Occidental, These projects are designed replace declining capacity elsewhere Saudi Arabia's oil infrastructure, keeping total Saudi oil production capacity about 10.5 million barrels per day. This list does not include routine expenditures necessary maintain existing oil production facilities selected natural gas projects managed exclusively Aramco. Total direct investment potential these projects projected range $40 billion, 
according Foreign Minister Saud al-Faysal. 

Source: Micklle East Economic Survey, Platt's, and other industry journals. 

35AS0713 
UNCLASSIFIED 
DOC044-0004